VII LTTB
Add to comparison
Add the vehicle with its basic configuration to comparison Remove the vehicle from comparison Add the vehicle with its current configuration to comparison Remove the vehicle from comparison

LTTB U.S.S.R.

Add to comparison
Add the vehicle with its basic configuration to comparison Remove the vehicle from comparison Add the vehicle with its current configuration to comparison Remove the vehicle from comparison

Development of the light tank project was started in early 1944 at Factory No. 174. The project was canceled during the design phase and the phase of setting tactical and technical requirements.

Nation U.S.S.R. U.S.S.R.
Tier Tier VII
Type Light Tank Light Tank
Cost Credits 1,380,000 Experience 59,150

Crew

Crew Member Commander
Crew Member Driver
Crew Member Gunner
Crew Member Loader

Loader

Radio Operator

Characteristics

Reset Configuration

Characteristics

FirepowerFirepower

/ / / / HP Damage
rounds/min Rate of Fire
(HP/min) Damage per Minute
/ / / / mm Armor Penetration
m Dispersion at 100 m
s Aiming Time
pcs Ammo Capacity

MobilityMobility

/ / t Weight/Load Limit
hp Engine Power
hp/t Specific Power
km/h Top Speed
deg/s Traverse Speed
deg/s Turret Traverse Speed

SurvivabilitySurvivability

HP Hit Points
/ / mm Hull Armor
/ / / / mm Turret Armor

SpottingSpotting

m View Range
m Signal Range

Characteristics are specified for a vehicle with crew members trained to 100%.

Close